MII IG Kerndatensatz-Modul Molekulares Tumorboard
2027.0.0-ballot.1 - Germany

This page is part of the MII Implementation Guide Molecular Tumor Board (v2027.0.0-ballot.1: Release) based on FHIR (HL7® FHIR® Standard) R4. This is the current published version in its permanent home (it will always be available at this URL). For a full list of available versions, see the Directory of published versions

ValueSet: MII VS MTB Systemtherapie Status

Official URL: https://www.medizininformatik-initiative.de/fhir/ext/modul-mtb/ValueSet/mii-vs-mtb-systemische-therapie-status Version: 2027.0.0-ballot.1
Active as of 2026-09-15 Computable Name: MII_VS_MTB_Systemische_Therapie_Status

Einschränkung der Status für Systemtherapie

References

Logical Definition (CLD)

Language: de-DE

  • Include these codes as defined in http://hl7.org/fhir/event-status version 📦4.0.1
    CodeDisplayDefinition
    not-doneNot DoneThe event was terminated prior to any activity beyond preparation. I.e. The 'main' activity has not yet begun. The boundary between preparatory and the 'main' activity is context-specific.
    in-progressIn ProgressThe event is currently occurring.
    stoppedStoppedThe event was terminated prior to the full completion of the intended activity but after at least some of the 'main' activity (beyond preparation) has occurred.
    completedCompletedThe event has now concluded.

 

Expansion

Expansion performed internally based on codesystem EventStatus v4.0.1 (CodeSystem)

This value set contains 4 concepts

SystemCodeDisplay (de-DE)DefinitionJSONXML
http://hl7.org/fhir/event-status  not-doneNot DoneThe event was terminated prior to any activity beyond preparation. I.e. The 'main' activity has not yet begun. The boundary between preparatory and the 'main' activity is context-specific.
http://hl7.org/fhir/event-status  in-progressIn ProgressThe event is currently occurring.
http://hl7.org/fhir/event-status  stoppedStoppedThe event was terminated prior to the full completion of the intended activity but after at least some of the 'main' activity (beyond preparation) has occurred.
http://hl7.org/fhir/event-status  completedCompletedThe event has now concluded.

Description of the above table(s).